Qingdao Ecorin Polyurethane Machinery
|
Gold Index: 8518
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Simple Operation Polyurethane Moulding Machine For Rigid Foam 1 Year Warranty
PLC control Low Pressure Metering Machine for polyurethane elastomer machine used making Elastomer Gear
Mixing head
1. Using new type mixing means, mixing evenly, no bubble.
Metering unit
1. High precision metering pumps; Promise or frequency control system;
2. Speed ratio more convenient. Precision error ≤±1%
3. Using hot oil circulation termostat agency. Material temperature more accurate, Temperature error<±2ºC
Special device
1. Designed non-return device for elastomer perfusion
2. LXCPU series polyurethane elastomer casting machine, with vacuum degasser
Electrical control system
1. Fully controlled by SCM (Single Chip Microcomputer)
2. Using PCL touch screen computer. Temperature, pressure, revolving speed display system.
3. Alarm function with acoustic warning
Alarm function with acoustic warning
Model | Output(1:1)g/s | Tank(L) | Power(KW) | ||
Min. | Max. | Prepolymer | MOCA | ||
BL(E)-1 | 200 | 800 | 120 | 30 | 17 |
BL(E)-5 | 1000 | 5000 | 150 | 30 | 19 |
BL(E)-10 | 3000 | 8000 | 220 | 40 | 23 |
BL(E)-15 | 5000 | 15000 | 220 | 40 | 26 |
BL(E)-25 | 8000 | 24000 | 300 | 40 | 33 |
4.
TPE both rubber and thermoplastic properties. At room temperature shows the high elasticity of rubber, room temperature and plastic molding of polymer materials, but also following the natural rubber, synthetic rubber, the so-called third generation of rubber. Thermoplastic elastomer polymer chain structure is characterized by the chemical composition of different resin (hard segment) and rubber segment (soft segment). Hard segment segment between force sufficient to form a physical crosslinking and hard segment of the physical crosslinking is reversible, the soft segment is in the proper order and to join the appropriate way to foot with larger free rotation ability of high elasticity.
Other Terms
1. Payment terms
The buyer should pay the prepayment of T/T 30% of the total amount and the left 70% of total amount should be paid to the seller by T/T
2. Delivery time
The producing time is 20 work days after receiving 30% deposit.
3. Inspection
Inspection place is the seller’s factory.
4. Force - majeure circumstances
Due to force majeure the contract may be terminated automatically.
5. Ownership
The ownership of the above mentioned products transfer from the seller to the buyer at time of delivery. If the buyer shall not pay, the ownership of the products belongs to the seller.
6. Arbitrage
All disputes and disagreement that may arouse in connection with the present Contract, both sides of the present Contract could solve by negotiation firstly, or else both sides can go to “Qingdao Arbitration Commission” for a fair solving result.
Qingdao Ecorin Polyurethane Machinery [China (Mainland)]
Business Type:Manufacturer
City: Qingdao
Province/State: Shandong
Country/Region: China (Mainland)